TX 75083-3836, U.S.A., fax 01-972-952-9435.
AbstractIndustry experience has shown that frac pack completions can provide effective production stimulation and reliable sand control for unconsolidated sand reservoirs. One of the more rewarding areas of opportunity is in the completion of longer and more complex intervals that can be stimulated with a single frac pack, high-rate water-pack (HRWP) or EX-Tension Pac SM Service treatment. One of the major considerations in planning the \well completions in the BZ-25-1 field was design efficiency. To complete each individually zone independently with a Stack Pack completion would have been very time consuming. This paper presents the results from installing frac-pack and HRWP treatments through a single-trip, multiple-zone (STMZ) completion system in the offshore Bohai field in China. Using the 9 5/8 × 4.75-in. ID single-trip gravel pack tools, operators have performed frac packing and HRWP treatments on 58 wells, on three platforms, during 2003 and 2005 with an average of 3 to 5 zones per well, spending an average of less than 3 days to complete each well. This paper presents the selection process for the completion technique used to achieve high production efficiency and initial performance of the field. It provides guidelines and results associated with frac packing and demonstrates the importance of selecting completion techniques that will provide high-efficiency production.