“…The Equatorial Port Plug of the original model has been completely removed and the three-drawers structure with the 100% SS (SS-316) framework containing them has been described. Inside each drawer a three layer shielding structure (70% SS/30% water for the 1st layer, 30% SS/70% water for the 2nd and 3rd layers) has been assumed, according to a structural analysis previously performed [2], while 100% SS walls have been modeled for the side drawers. All the planes surrounding the Equatorial Port have been shifted to define a 20 mm straight gap surrounding the Port itself.…”