Project buffer sizing and dynamic buffer consumption algorithm in power generation construction

Abstract: PurposeThe aim of this research is to propose a buffer sizing and buffer controlling algorithm (BSCA) as a heuristic algorithm for calculating project buffer and feeding buffers as well as dynamic controlling of buffer consumption in different phases of a wind power plant project in order to achieve a more realistic project duration.Design/methodology/approachThe BSCA algorithm has two main phases of planning and buffer sizing and construction and buffer consumption. Project buffer and feeding buffers are dete… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
2
1

Relationship

3
4

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 39 publications
0
5
0
Order By: Relevance
“…In this way, the amount of buffers which remains unconsumed in each phase of the project, will be transferred to the next phase. In addition, Zohrehvandi et al (2021) proposed a project time optimization algorithm for calculating project buffer and feeding buffers as well as dynamic controlling of buffer consumption in different phases of a wind power plant project for finding a more realistic project duration. The author is currently working deeply on this topic and has several articles under review that will develop this topic.…”
Section: Scheduling Methodsmentioning
confidence: 99%
“…In this way, the amount of buffers which remains unconsumed in each phase of the project, will be transferred to the next phase. In addition, Zohrehvandi et al (2021) proposed a project time optimization algorithm for calculating project buffer and feeding buffers as well as dynamic controlling of buffer consumption in different phases of a wind power plant project for finding a more realistic project duration. The author is currently working deeply on this topic and has several articles under review that will develop this topic.…”
Section: Scheduling Methodsmentioning
confidence: 99%
“…The idea of adding a time margin to the minimal project completion time as a time buffer and using it in case of delayed occurrences was introduced by Zohrehvandi et al [35]. Other research conducted by Zohrehvandi et al in the field of modeling and optimization in scheduling and project buffer management could refer to these cases [36][37][38][39].…”
Section: Literature Reviewmentioning
confidence: 99%
“…(2020a, b) proposed a project time optimization algorithm for calculating project buffer and feeding buffers and dynamic control of buffer consumption in different phases of a wind power plant project to find a more realistic project duration. In addition, Zohrehvandi et al. (2021) introduced a heuristic project time optimization algorithm to determine the sizes of project buffer and feeding buffers and dynamically control buffer consumption, named Fuzzy Overlapping Buffer Management Algorithm (FOBMA).…”
Section: Literature Reviewmentioning
confidence: 99%