Project management for complex ground-based instruments: MEGARA plan

Abstract: The project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from di… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2014
2014
2016
2016

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 10 publications
0
3
0
Order By: Relevance
“…The manufacturing process is described by Carrasco et al [2]. Different MEGARA subsystems are discussed by Castillo et al [3], Ferrusca et al [4], Ortíz et al [5], García-Vargas et al [6] and Pérez-Calpena et al [7]. Specific processes in the optical fabrication are briefly described by Izazaga et al [8].…”
Section: Introductionmentioning
confidence: 99%
“…The manufacturing process is described by Carrasco et al [2]. Different MEGARA subsystems are discussed by Castillo et al [3], Ferrusca et al [4], Ortíz et al [5], García-Vargas et al [6] and Pérez-Calpena et al [7]. Specific processes in the optical fabrication are briefly described by Izazaga et al [8].…”
Section: Introductionmentioning
confidence: 99%
“…Finally, MEGARA includes a detailed management plan that, within a series of managerial parameters, that is currently allowing a successful AIV (Assembly, Integration and Verification) and a timely deliver to GTC while satisfying all instrument and functional requirements. More details on the MEGARA system engineering and management plan are provided in Section 10 and in other publications in this volume 21 .…”
Section: Overviewmentioning
confidence: 99%
“…This Management Plan is based on the final contracts for the detailed design, construction, assembly, integration, verification (AIV) and commissioning of MEGARA signed on April 28 th and May 5 th 2014 between GRANTECAN S.A. and the UCM 21 .…”
Section: System Engineering and Management Planmentioning
confidence: 99%