2005
DOI: 10.1016/j.jmatprotec.2004.08.023
|View full text |Cite
|
Sign up to set email alerts
|

PROPLAN: an expert system for optimal planning of sheet metal operations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2005
2005
2016
2016

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 6 publications
0
5
0
Order By: Relevance
“…knowledge-based systems have been used to solve various problems in manufacturing systems, including various design problems (Basu et al 1995), planning (Singh and Sekhon 2005), machine monitoring, diagnosis and maintenance (Majstorovic and Milacic 1990), system configuration, managing complexity and uncertainty (Monostroni 2003), process control and monitoring (Barschdorff et al 1997;Lekova and Batanov 1998), quality assurance (Sibalija 1992;Smith and Dagli 1994;Westkamper 1997;El-Shal and Morris 2000) etc. Since 1980s, ES and ES-related types of IS i.e.…”
Section: Multiresponse Optimisation Using Expert Systemmentioning
confidence: 99%
“…knowledge-based systems have been used to solve various problems in manufacturing systems, including various design problems (Basu et al 1995), planning (Singh and Sekhon 2005), machine monitoring, diagnosis and maintenance (Majstorovic and Milacic 1990), system configuration, managing complexity and uncertainty (Monostroni 2003), process control and monitoring (Barschdorff et al 1997;Lekova and Batanov 1998), quality assurance (Sibalija 1992;Smith and Dagli 1994;Westkamper 1997;El-Shal and Morris 2000) etc. Since 1980s, ES and ES-related types of IS i.e.…”
Section: Multiresponse Optimisation Using Expert Systemmentioning
confidence: 99%
“…Since 1980s, ES and ES-related types of IS i.e. knowledge-based systems have been used to solve various problems in manufacturing systems, including various design problems (Basu et al 1995), planning (Singh and Sekhon 2005), machine monitoring, diagnosis and maintenance (Majstorovic and Milacic 1990), system configuration, managing complexity and uncertainty (Monostroni 2003), process control and monitoring (Barschdorff et al 1997;Lekova and Batanov 1998), quality assurance (Sibalija 1992;Smith and Dagli 1994;Westkamper 1997;El-Shal and Morris 2000) etc.…”
Section: Multiresponse Optimisation Using Expert Systemmentioning
confidence: 99%
“…A list of chief data sources utilized during the present investigation can be found in [11]. Information on die-set selection was obtained from industrial experts by holding discussions on typical problems and letting the experts talk about the approach, formulae and thumb-rules relied upon by them.…”
Section: Acquisition Of Information On Die-set Selectionmentioning
confidence: 99%