2020
DOI: 10.1088/1757-899x/960/4/042068
|View full text |Cite
|
Sign up to set email alerts
|

Qualitative risk assessment of passive house design and construction processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

2
4

Authors

Journals

citations
Cited by 9 publications
(10 citation statements)
references
References 10 publications
0
9
0
1
Order By: Relevance
“…Ketika tidak ada pengawasan ketat, kualitas pekerja pun tidak akan sebaik yang diharapkan. Ada juga penyebab lainnya yaitu kesalahan dalam pemakaian material bangunan seperti penggunaan material bangunan dibawah standar yang ditentukan dan juga tindakan korupsi pada biaya ataupun material bangunan (Krechowichz, 2020).…”
Section: Pendahuluanunclassified
“…Ketika tidak ada pengawasan ketat, kualitas pekerja pun tidak akan sebaik yang diharapkan. Ada juga penyebab lainnya yaitu kesalahan dalam pemakaian material bangunan seperti penggunaan material bangunan dibawah standar yang ditentukan dan juga tindakan korupsi pada biaya ataupun material bangunan (Krechowichz, 2020).…”
Section: Pendahuluanunclassified
“…The applied methodology of risk identification included carrying out a literature study, scenario analysis, risk interviews with manufacturers of systems, and building materials dedicated for passive construction, passive buildings, architects, constructors, and contractors, as well as the own experience of one of the authors as Certified Passive House Consultant coming from observations of passive buildings development and operation. In the author's previous work [17], 30 risks in passive house projects were identified and assigned into four categories: problems with architectural and construction design, installation design, and difficulties at the building site. The identified risk factors will not be mentioned in this paper due to their length.…”
Section: Risk Assessment 211 Risk Identificationmentioning
confidence: 99%
“…The TE was understood as an unsuccessful passive building project, not meeting the project objectives, exceeding the project budget or the failure to comply with the work schedule, or not meeting the passive house quality standards. In the author's previous work [17], the FMEA technique was used to qualitatively analyze 30failure modes in passive buildings projects, identify their causes, consequences, and the possibilities of detection. On this basis, four intermediate events and 16 BEs or UEs in the FFT were defined and presented in Table 1.…”
Section: Risk Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…It is essential to adapt the risk management process to the specificity of the operation and context of the enterprise [47]. There are many methods that were successfully applied in risk assessment models, e.g., two-, three-, or five-parametric risk estimation matrix [48], fuzzy fault tree analysis [49], hybrid fuzzy fault and event tree analysis [50], event tree analysis [51], and Failure Mode and Effects Analysis [52,53]. Besides this, machine learning has recently become increasingly used in risk assessment [54][55][56].…”
Section: Introductionmentioning
confidence: 99%