Quantifying the Delay from Lost Productivity

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 10 publications
0
3
0
Order By: Relevance
“…One of the most imperative project deliverables to be considered when making a construction contract is project duration; however, it is difficult to accomplish a construction project in which many construction activities are beyond the control of the contractor [50], [51]. It was also detected in this study that most of the projects end up with disputes due to delays in projects.…”
Section: Discussionmentioning
confidence: 70%
“…One of the most imperative project deliverables to be considered when making a construction contract is project duration; however, it is difficult to accomplish a construction project in which many construction activities are beyond the control of the contractor [50], [51]. It was also detected in this study that most of the projects end up with disputes due to delays in projects.…”
Section: Discussionmentioning
confidence: 70%
“…Therefore, a difficult hurdle for disruption claims is often proving causation – that the alleged act of one party resulted in the disruption or loss of productivity in the other. The loss of labor productivity reflects that more resources are required to perform a certain task, which in some cases might lead to taking a longer duration to perform this task (Mikhail and Serag, 2019).…”
Section: Methods Of Analyzing Lost Productivitymentioning
confidence: 99%
“…Recently, Mikhail and Serag (2019) maintained that to accurately calculate the delay duration due to loss of labor productivity, a logical method for analyzing schedule delay was required; the authors proposed an approach based on the measured mile study, one of the most recommended methods of loss of productivity calculations, to quantify the delay due to lost productivity. Zhao and Dungan (2019) discussed how to develop a project-specific productivity curve regarding the effect of a key project variable on productivity, and then demonstrated the application of project-specific productivity curves to loss of productivity analysis through a case study.…”
Section: Literature Review Of Lost Productivitymentioning
confidence: 99%