2021
DOI: 10.1007/s11356-021-15858-3
|View full text |Cite
|
Sign up to set email alerts
|

Quantitative methods for predicting underground construction waste considering reuse and recycling

Abstract: The construction industry has been greatly developed in the past few decades, especially in the extensive use of underground space. The increasing amount of waste (e.g., soil, sludge, and rock) generated in the underground construction constitutes an important part of construction and demolition waste (CDW) but the related problems are rarely addressed in an independent quantitative study. In order to facilitate recycling of underground construction waste (UCW), quantitative methods for predicting UCW are prop… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(1 citation statement)
references
References 39 publications
0
1
0
Order By: Relevance
“…In recent years, several tunneling projects, such as Delhi Metro Pink Line Project in India, Marmaray Rail Tunnel in Turkey, Gotthard Base Tunnel in Switzerland, and Sydney Metro Northwest in Australia, implemented advanced TBMs equipped with sensors and sorting mechanisms to classify spoil like sludge, soil, and recoverable sand-gravel. A significant percentage ranging from 70% to 96% across projects was recycled and reused [4,23,32].…”
Section: Recycling Of Tunnel Excavation Materials 21 On-site Reusingmentioning
confidence: 99%
“…In recent years, several tunneling projects, such as Delhi Metro Pink Line Project in India, Marmaray Rail Tunnel in Turkey, Gotthard Base Tunnel in Switzerland, and Sydney Metro Northwest in Australia, implemented advanced TBMs equipped with sensors and sorting mechanisms to classify spoil like sludge, soil, and recoverable sand-gravel. A significant percentage ranging from 70% to 96% across projects was recycled and reused [4,23,32].…”
Section: Recycling Of Tunnel Excavation Materials 21 On-site Reusingmentioning
confidence: 99%