Transit Development in Rock Mechanics 2014
DOI: 10.1201/b17617-13
|View full text |Cite
|
Sign up to set email alerts
|

Quick estimation method on parameters of loosened zone around large underground cavern based on measured data from embedded multipoint extensometers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Each increase in the height of the filling material is small. At the final stage, the filling material will not shrink due to large natural subsidence and leaves an empty top (Chen, Ji, Zhang, & Wu, 2014).…”
Section: Improving the Filling Processmentioning
confidence: 99%
See 1 more Smart Citation
“…Each increase in the height of the filling material is small. At the final stage, the filling material will not shrink due to large natural subsidence and leaves an empty top (Chen, Ji, Zhang, & Wu, 2014).…”
Section: Improving the Filling Processmentioning
confidence: 99%
“…(3) Multi-point cutting filling (Chen, Ji, Zhang, & Wu, 2014): this method is used for filling slurry with poor liquidity, in order to avoid filling blind. In the case of conditions that increase the number of cutting points, where the gravity gradient of filling slurry is small, the top filling rate increases accordingly.…”
Section: Improving the Filling Processmentioning
confidence: 99%