“…Moreover, this technology is used to increase the rate of production by enlarging the volume of the production tubing as well as sand control screens in open holes. Several studies related to SETT have been performed over the last two decades 2–5 and proved its viability in field applications 6–12 . However, very limited studies dealing with expansion of sand control screens have been conducted 11 …”