2007 3rd International Conference on Recent Advances in Space Technologies 2007
DOI: 10.1109/rast.2007.4284040
|View full text |Cite
|
Sign up to set email alerts
|

Rasat Leo Satellite Power System Design and Operation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2011
2011
2011
2011

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…• Solar Panels (SP) The power subsystem of RASAT flight model differs from BiLSAT in 2003 and the first pre-designed RASAT power subsystem in 2006 in terms of new technologies, reliability, and the qualification verification levels [3] [4]. In the following sections, the design and implementation details and qualification levels of RASAT power subsystem and its units will be presented in detail.…”
Section: Introductionmentioning
confidence: 99%
“…• Solar Panels (SP) The power subsystem of RASAT flight model differs from BiLSAT in 2003 and the first pre-designed RASAT power subsystem in 2006 in terms of new technologies, reliability, and the qualification verification levels [3] [4]. In the following sections, the design and implementation details and qualification levels of RASAT power subsystem and its units will be presented in detail.…”
Section: Introductionmentioning
confidence: 99%