Real-time commercial availability index of a steam power plant: Graph theory and matrix method

Abstract: Worldwide, the structure of the power industry is changing to that of a market economy to ensure commercial accountability. Resources, therefore, are allocated for operation and maintenance from commerical considerations rather than technical alone, necessitating the introduction of a commercial approach to analysis of reliabilty, efficiency, and maintenance criticality for power plants. These requirements suggest the need to introduce performance monitoring systems in the form of a single composite index enco… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 4 publications
0
3
0
Order By: Relevance
“…For the successful S. No. Application field References 1 Quality Grover et al (2004Grover et al ( , 2005Grover et al ( , 2006, Kulkarni (2005) Mohan et al (2003Mohan et al ( , 2004Mohan et al ( , 2007Mohan et al ( , 2008, Garg et al (2006Garg et al ( , 2007, Dev et al (2012Dev et al ( , 2013 Structural modeling Prabhakaran et al (2006), Singh and Agrawal (2008), Kumar et al (2010) 5 Mechatronic system Kiran et al (2011Kiran et al ( , 2012 Supply chain management (SCM) Faisal et al (2006Faisal et al ( , 2007a, Kaur et al (2006) Manufacturing environment Venkatesh and Smith (2003), Rao (2004Rao ( , 2006a, Rao and Padmanabhan (2006, 2010, Chakladar et al (2009), Gadakh and Shinde (2011), Koulouriotis and Ketipi (2011) (Panneerselvam, 2012;Attri et al, 2012b;Poduval et al, 2013). Commitment of top management should be strongly demonstrated toward TPM implementation and they should explain the significance and benefits of it (Panneerselvam, 2012;Okpala and Onyekachi, 2016).…”
Section: Identification and Categorization Of Enablers For Tpm Implementationmentioning
confidence: 99%
“…For the successful S. No. Application field References 1 Quality Grover et al (2004Grover et al ( , 2005Grover et al ( , 2006, Kulkarni (2005) Mohan et al (2003Mohan et al ( , 2004Mohan et al ( , 2007Mohan et al ( , 2008, Garg et al (2006Garg et al ( , 2007, Dev et al (2012Dev et al ( , 2013 Structural modeling Prabhakaran et al (2006), Singh and Agrawal (2008), Kumar et al (2010) 5 Mechatronic system Kiran et al (2011Kiran et al ( , 2012 Supply chain management (SCM) Faisal et al (2006Faisal et al ( , 2007a, Kaur et al (2006) Manufacturing environment Venkatesh and Smith (2003), Rao (2004Rao ( , 2006a, Rao and Padmanabhan (2006, 2010, Chakladar et al (2009), Gadakh and Shinde (2011), Koulouriotis and Ketipi (2011) (Panneerselvam, 2012;Attri et al, 2012b;Poduval et al, 2013). Commitment of top management should be strongly demonstrated toward TPM implementation and they should explain the significance and benefits of it (Panneerselvam, 2012;Okpala and Onyekachi, 2016).…”
Section: Identification and Categorization Of Enablers For Tpm Implementationmentioning
confidence: 99%
“…Mohan et al (2003) applied graph theoretic model for performance analysis of coal-based steam power plant considering systems, subsystems and their interconnections. The authors applied the same methodology to evaluate various performance indices of steam power plant such as efficiency index, commercial availability index and reliability index (Mohan et al, 2006(Mohan et al, , 2007(Mohan et al, , 2008. Kumar et al (2010) developed various structural models for effluent treatment system.…”
Section: Cnc Cam Shaft Grinding Machinementioning
confidence: 99%
“…This methodology uses three stages covering their inheritances and interdependencies through digraph approach, matrix, and permanent representation. This approach has been applied by various authors in cross functional areas such as manufacturing science (Jain & Raj, 2015; Raj et al., 2010; Rao & Gandhi, 2002), and power plant (Mohan et al., 2007). Although there are various approaches such as analytic hierarchy process (AHP), analytic network process (ANP), and structural equation modelling (SEM) are various methods for finding out the predictors and ranking the best predictors.…”
Section: Introductionmentioning
confidence: 99%