“…The most important sub-procedure for the algorithm is to verify if the tube with parameter c is safe. As in (25), we can verify the safety of the tube using SOS programming Jasour et al (2021b). Let S(t) = {x : g i (x, t) ≥ 0, i = 1, ..., ℓ} be the feasible set of optimization (29) at time t, t ∈ [t 0 , t f ], i.e., the set constructed by the polynomial constraints of all the risk contours Ĉ∆ ri , i = 1, ..., n os , Ĉ∆ rj (t), j = n os + 1, ..., n o d , as well as the upperbound constraint…”