All Days 2015
DOI: 10.2118/181122-ms
|View full text |Cite
|
Sign up to set email alerts
|

Reaming with Casing Technology Reduces Rig Time by 50% in Challenging Limestone and Shale Formation in Pakistan

Abstract: This paper covers successful Reaming with Casing job in Maino-17 located in Sindh, Pakistan. Throughout previous jobs during drilling in Miano block, Operator observed hole packoff and continuous caving, which raised concerns about running casing to TD. Specifically, drilling 12 ¼" hole section in Sui Main Limestone and Ghazij Shale, pressure and mechanical caving were observed throughout till TD. During wiper trip prior to run in hole 9–5/8" casing the hole condition was not good as it was packing off. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?