2007 IEEE Particle Accelerator Conference (PAC) 2007
DOI: 10.1109/pac.2007.4440794
|View full text |Cite
|
Sign up to set email alerts
|

Recent progress of KEKB

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2007
2007
2019
2019

Publication Types

Select...
3
2

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…The KEB collider was a big competitor for PEP-II, with a smaller energy asymmetry. KEKB [4] operated from 1999 to June 2010, reached a peak luminosity more than double with respect to the design value, delivering >1040 fb −1 to Belle. The two rings, crossing with a small horizontal crossing angle of 22 mrad, were completely new, and the design beam parameters were pushed in order to achieve an unprecedented luminosity of 10 34 cm -2 s -1 .…”
Section: Past Colliders: B-factories Pep-ii Kekbmentioning
confidence: 96%
“…The KEB collider was a big competitor for PEP-II, with a smaller energy asymmetry. KEKB [4] operated from 1999 to June 2010, reached a peak luminosity more than double with respect to the design value, delivering >1040 fb −1 to Belle. The two rings, crossing with a small horizontal crossing angle of 22 mrad, were completely new, and the design beam parameters were pushed in order to achieve an unprecedented luminosity of 10 34 cm -2 s -1 .…”
Section: Past Colliders: B-factories Pep-ii Kekbmentioning
confidence: 96%
“…Approximately 90% of the beam pipes in the ring possessed antechambers and the TiN film coating. B z values of up to several millitesla [14,19,50,[56][57][58] were applied by solenoids to the beam pipes in the drift spaces between electromagnets, such as quadrupole or bending magnets, in the ring. In Table I, the circles indicate the countermeasures applied in each major section.…”
Section: Lengthmentioning
confidence: 99%
“…For the beam pipes that had been used since the KEKB era, where the solenoids were already wound, the solenoids were revived, as shown in Fig. 9 [50,57,58]. The magnetic fields generated by these type-1 and type-2 units for the beam pipes are not uniform in the beam direction, as indicated in Figs.…”
Section: Additional Countermeasuresmentioning
confidence: 99%
“…Furthermore, longitudinal grooves and clearing electrodes were prepared in the dipole magnets and wiggler magnets, respectively [29][30][31][32][33][34]. Axial magnetic fields (solenoidal magnetic fields) will be applied along the beam pipes in the drift spaces in the future [35][36][37], but these were not prepared for the first (Phase-1) commissioning.…”
Section: Introductionmentioning
confidence: 99%