2022
DOI: 10.2139/ssrn.4228523
|View full text |Cite
|
Sign up to set email alerts
|

Reducing Power Peaks in Railway Traffic Flow Subject to Random Effects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 41 publications
0
3
0
Order By: Relevance
“…In other words, the system is a counting point [3], and its application with a checkpoint device [4] or a counting device [8] allows solving such tasks of railway automation and telemechanic system such as monitoring the vacancy of track sections and determining the ordinate of the rolling stock. In other words, the system is a counting point [15], and its application with a checkpoint device [17][18][19] or a counting device [16] allows solving such tasks of SZAT such as monitoring the vacancy of track sections and determining the ordinate of the rolling stock [5].…”
Section: Methodsmentioning
confidence: 99%
“…In other words, the system is a counting point [3], and its application with a checkpoint device [4] or a counting device [8] allows solving such tasks of railway automation and telemechanic system such as monitoring the vacancy of track sections and determining the ordinate of the rolling stock. In other words, the system is a counting point [15], and its application with a checkpoint device [17][18][19] or a counting device [16] allows solving such tasks of SZAT such as monitoring the vacancy of track sections and determining the ordinate of the rolling stock [5].…”
Section: Methodsmentioning
confidence: 99%
“…For the reception and departure of a mixed route from the station, the station attendant agrees to send the train from the station. In case of malfunction and abnormal situation of the route, according to the rules of technical operation, stopping point of the route must be at exit traffic light of station and also at input traffic light [13][14][15][16][17][18][19][20][21][22][23].…”
Section: Introductionmentioning
confidence: 99%
“…there are additional shunting zones for the approach and departure of the train from the track circuit. This zone can vary widely depending on state of upper structure of the track [12][13][14][15][16][17][18][19][20].…”
Section: Introductionmentioning
confidence: 99%