2008
DOI: 10.1134/s0005117908100111
|View full text |Cite
|
Sign up to set email alerts
|

Redundantization of interdependent program modules for parallel control computing systems: Organization, estimation of fault-tolerance, formalized description

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2010
2010
2018
2018

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(7 citation statements)
references
References 3 publications
0
7
0
Order By: Relevance
“…The purpose of the article is a method for constructing a high-performance software complex for designing complex systems on parallel computers in full, based on existing mathematical models, methods and algorithms for multilevel stochastic modeling, which are used to calculate the average execution time for specific complex tasks (defined by a set of interrelated jobs -CIJ) parallel computing systems [10][11][12][13][14][15][16][17]. The software package described in the article solves the problem of design in full.…”
Section: Statement Of the Problemmentioning
confidence: 99%
See 4 more Smart Citations
“…The purpose of the article is a method for constructing a high-performance software complex for designing complex systems on parallel computers in full, based on existing mathematical models, methods and algorithms for multilevel stochastic modeling, which are used to calculate the average execution time for specific complex tasks (defined by a set of interrelated jobs -CIJ) parallel computing systems [10][11][12][13][14][15][16][17]. The software package described in the article solves the problem of design in full.…”
Section: Statement Of the Problemmentioning
confidence: 99%
“…We will assume that a certain discipline (criterion) K [14] is given for an unambiguous selection of jobs from buffer B for maintenance in the CD, for example, the choice of job with the smallest number, therefore when the CD is released, the jobs according to the given criterion K have the highest priority (dispatch rule) [13][14][15][16][17][18].…”
Section: Fig 2 Mathematical Modelmentioning
confidence: 99%
See 3 more Smart Citations