2007
DOI: 10.1109/tie.2007.893059
|View full text |Cite
|
Sign up to set email alerts
|

Regulation of Photovoltaic Voltage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
112
0
12

Year Published

2008
2008
2020
2020

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 317 publications
(124 citation statements)
references
References 6 publications
0
112
0
12
Order By: Relevance
“…The continuous-time transfer function of the small-signal model of this circuit can be found in [35], with the duty cycle, D(s), being the system input and the PV voltage, Vpv(s), the system output. To introduce PV power, Ppv(s), as the system output in place of Vpv(s), the following relation is used between small perturbations ΔPpv and ΔVpv: where the gain K0, the undamped natural frequency ω0 and the damping factor ξ are given by:…”
Section: A System Model Linearizationmentioning
confidence: 99%
See 1 more Smart Citation
“…The continuous-time transfer function of the small-signal model of this circuit can be found in [35], with the duty cycle, D(s), being the system input and the PV voltage, Vpv(s), the system output. To introduce PV power, Ppv(s), as the system output in place of Vpv(s), the following relation is used between small perturbations ΔPpv and ΔVpv: where the gain K0, the undamped natural frequency ω0 and the damping factor ξ are given by:…”
Section: A System Model Linearizationmentioning
confidence: 99%
“…The "delay" block in Fig. 7 is a first-order Pade approximation [35] of the aggregate (digital) delay Td corresponding to the PWM and execution time delays (in this case equal to the switching period Tc=50 μs). Therefore, the …”
Section: B Closed Loop Systemmentioning
confidence: 99%
“…The corresponding values of mode and mean are different, so the unimodality has to be tested by (5), and all of the distributions satisfy the constraint U* < 186/125. Nevertheless, it is important to point up that the sign of skewness is changed for all the six distributions; so, until March, the data was spread out more to the right of the mean than to the left, but, on the yearly basis, they are spread out more to the left of the mean and this happens for each array.…”
Section: Yearly Analysis (January-december)mentioning
confidence: 99%
“…Several models that are able to evaluate the effects of such uncertainties have been proposed in [1][2][3][4][5][6][7][8][9], whereas the statistical methods have been used for the design of PV plants [10,11] and for the suitable choice of the electrical components [12,13]. When a PV plant is operating, a monitoring system to check the performance in all the environmental conditions is needed.…”
Section: Introductionmentioning
confidence: 99%
“…A wide variety of them have been proposed in the literature, some of the most recent being described in [11]- [19]. In this paper, the perturb and observe (P&O) technique is considered due to its high performance and simple and cost-effective implementation [20].…”
Section: DC Analysis Of a String Of Scpvmsmentioning
confidence: 99%