2011
DOI: 10.1016/j.amc.2011.10.016
|View full text |Cite
|
Sign up to set email alerts
|

Reliability analysis of Polytube industry using supplementary variable technique

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
9
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 41 publications
(9 citation statements)
references
References 15 publications
0
9
0
Order By: Relevance
“…Critical components of the system were also determined. Shakuntla et al (2011) computed the reliability of the polytube manufacturing plant. Two methods, Lagrange's method and Laplace transformation were used for the reliability evaluation of the system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Critical components of the system were also determined. Shakuntla et al (2011) computed the reliability of the polytube manufacturing plant. Two methods, Lagrange's method and Laplace transformation were used for the reliability evaluation of the system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Shakuntla et al [2] discussed poly tube availability analysis using the supplementary variable technique. Also, reducing the risk of hazards for optimum reliability was studied by Yang et al [3].…”
Section: Introductionmentioning
confidence: 99%
“…Zhang and Wu [7] used the supplementary variable technique to propose a method for the reliability analysis of a machine repair system with k out n spare units and an F-policy. Shakuntla et al [8] exploited this technique to propose reliability analysis for the polytube industry. This technique was utilized to analyze an M/G/1 machine repair system under multiple imperfect coverages by Wang et al [9].…”
Section: Introductionmentioning
confidence: 99%