2018
DOI: 10.1109/tsusc.2018.2801123
|View full text |Cite
|
Sign up to set email alerts
|

Reliability-Aware Energy Management in Mixed-Criticality Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
2
1

Relationship

2
6

Authors

Journals

citations
Cited by 33 publications
(11 citation statements)
references
References 14 publications
0
11
0
Order By: Relevance
“…It causes serious service interruption for LC tasks. Therefore, in addition to power management This is an extended version of the paper accepted to be published in IEEE (TCAD) 2021 which includes Appendices A-E [23], Socci'19 [24], Baruah'16 [19], Medina'17 [25] × × × × × 2 Li'16 [26], Pathan'18 [27] × × × × 3 Medina'18 [22], [28], Choi'18 [29], Bolchini'13 [30] × × × 4 Huang'14 [12], Li'14 [13], Ali'15 [14], Narayana'16 [15], Taherin'18 [16], Awan'16 [17] × × × × × 5 Lee'14 [7], Munawar'14 [8]…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…It causes serious service interruption for LC tasks. Therefore, in addition to power management This is an extended version of the paper accepted to be published in IEEE (TCAD) 2021 which includes Appendices A-E [23], Socci'19 [24], Baruah'16 [19], Medina'17 [25] × × × × × 2 Li'16 [26], Pathan'18 [27] × × × × 3 Medina'18 [22], [28], Choi'18 [29], Bolchini'13 [30] × × × 4 Huang'14 [12], Li'14 [13], Ali'15 [14], Narayana'16 [15], Taherin'18 [16], Awan'16 [17] × × × × × 5 Lee'14 [7], Munawar'14 [8]…”
Section: Related Workmentioning
confidence: 99%
“…The total power consumption of a core in an embedded system consists of three major components, Dynamic power (𝑃 𝑑 ), static power (𝑃 𝑠 ), and frequency-independent power (𝑃 𝑖𝑛𝑑 ) [16], [33]. We consider a pessimistic approach to obtain the dynamic power consumption of HC tasks as well as LC tasks.…”
Section: Power Modelmentioning
confidence: 99%
“…Using the fault tolerance techniques such as re-execution to guarantee the system's reliability and safety requirement has timing overheads, which is a common practice [46]. However, since the MC systems are safety-critical, its correct operation throughout a complete time interval is crucial even in the case of fault occurrence to prevent catastrophic consequences [51]. Fig.…”
Section: Uboundmentioning
confidence: 99%
“…map the tasks to the processors with Algorithm 1 12 if not feasible then 13 return does not exist a feasible mapping /* enter the relaxing phase */ 14 while any primary frequency can be decreased do 15 select task i with LEF or LPF criteria…”
Section: Rr N°9259mentioning
confidence: 99%
“…In [13], Taherin et al propose an approach for energy management that is only applied on "low-criticality tasks in low-criticality mode to preserve the original reliability of the system". This approach cannot guarantee that a reliability threshold is met.…”
Section: Related Workmentioning
confidence: 99%