2011
DOI: 10.4018/jdst.2011040102
|View full text |Cite
|
Sign up to set email alerts
|

Reliability Based Scheduling Model (RSM) for Computational Grids

Abstract: Computational Grid attributed with distributed load sharing has evolved as a platform to large scale problem solving. Grid is a collection of heterogeneous resources, offering services of varying natures, in which jobs are submitted to any of the participating nodes. Scheduling these jobs in such a complex and dynamic environment has many challenges. Reliability analysis of the grid gains paramount importance because grid involves a large number of resources which may fail anytime, making it unreliable. These … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
12
0

Year Published

2014
2014
2017
2017

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(12 citation statements)
references
References 22 publications
0
12
0
Order By: Relevance
“…The completion time estimation depends on two factors: execution time 'E' of the module on a node and the intermodule communication time 'B' in form of data exchange between the modules of the job allocated on the nodes having a distance 'D' between them [7,14,20].…”
Section: Load Balancing Allocation (Lba) Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…The completion time estimation depends on two factors: execution time 'E' of the module on a node and the intermodule communication time 'B' in form of data exchange between the modules of the job allocated on the nodes having a distance 'D' between them [7,14,20].…”
Section: Load Balancing Allocation (Lba) Methodsmentioning
confidence: 99%
“…makespan, reliability, availability, throughput, energy consumption for job scheduling in computational grid [6,7,14,[16][17][18]. Most of these models did scheduling with a single objective.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…It also proposes a solution integrated with grid monitoring and optimization tool. Reliability-based scheduling is proposed in [28,30] with an objective of maximizing reliability. Reliability-based scheduling is proposed in [28,30] with an objective of maximizing reliability.…”
Section: Related Workmentioning
confidence: 99%
“…In , CG scheduling that gives priority to security is discussed. Reliability鈥恇ased scheduling is proposed in with an objective of maximizing reliability. Reliability鈥恇ased scheduling using modified GA is discussed in .…”
Section: Related Workmentioning
confidence: 99%