Reliability-Centered Maintenance Scheduling of Photovoltaic Components According to Failure Effects

Abstract: In the power distribution system of South Korea, the sectionalizer minimizes and recovers the system from failures, and prohibits independent operation of distributed energy resources. Therefore, it is difficult to expect reliability improvements owing to a photovoltaic system in the power distribution system. Herein, we propose a reliability-centered maintenance-scheduling method based on an economic analysis of photovoltaic integration facilities to ensure the economic feasibility of the photovoltaic system … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 28 publications
0
3
0
Order By: Relevance
“…If the MMC arm has a mean time to failure (MTTF), the arm's failure rate is calculated according to (18) [10]. In the case of a single SM failure rate, it is calculated according to (19) [30]. For the comparison of failure rates, one case from the case studies presented in this study is selected.…”
Section: (1) Comparison Of Failure Ratementioning
confidence: 99%
See 1 more Smart Citation
“…If the MMC arm has a mean time to failure (MTTF), the arm's failure rate is calculated according to (18) [10]. In the case of a single SM failure rate, it is calculated according to (19) [30]. For the comparison of failure rates, one case from the case studies presented in this study is selected.…”
Section: (1) Comparison Of Failure Ratementioning
confidence: 99%
“…The expected cost of power outage within the evaluation period is calculated by accumulating the annual EENS and multiplying it by the CDF. The CDF was assumed to be €3,120 per MWh, applying the unit cost of power outages in Spain [30]. Table 8 presents a comparison of the cost of power outage damages over a 20-y period.…”
Section:  =  ×  (21)mentioning
confidence: 99%
“…This study proposes a machine maintenance system using the Reliability Centered Maintenance (RCM) method [4]. The RCM method is expected to determine the maintenance schedule and the exact maintenance activities that must be carried out on each critical component of the Cake Breaker Conveyor [5]- [8].…”
Section: Introductionmentioning
confidence: 99%