2017
DOI: 10.1016/j.promfg.2017.02.092
|View full text |Cite
|
Sign up to set email alerts
|

Remanufacturing Process Capability Maturity Model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(10 citation statements)
references
References 5 publications
0
10
0
Order By: Relevance
“…This precision in testing explains why remanufactured products can be more reliable than new products, of which only a sample is usually subjected to final testing. [8,31,39,41]…”
Section: Remanufacturingmentioning
confidence: 99%
“…This precision in testing explains why remanufactured products can be more reliable than new products, of which only a sample is usually subjected to final testing. [8,31,39,41]…”
Section: Remanufacturingmentioning
confidence: 99%
“…Authors have found only one maturity model, which is solely dedicated for an assessment of the remanufacturing process, namely "The Remanufacturing Process Capability Maturity Model" (RPCMM) [29]. The RPCMM allows for the assessment of current resource-efficiency (as-is), but it has a very limited descriptive power.…”
Section: Aim Of This Paper Its Originality and Main Contributionsmentioning
confidence: 99%
“…The next is manufacturing and operational aspects include human-made tools for production and operations, production and operating owned technology; processes/sops in solar power plant development and operating processes; collaboration with stakeholders; running costs. Lastly, maintenance and repair aspects include maintenance and repair personnel, maintenance, and repair technology [18,28].…”
Section: External and Internal Environmental Aspectsmentioning
confidence: 99%
“…One of which is the Capacity Maturity Model (CMM) with the measurement tool maturity level. The Maturity Level Analysis Tool is a standard evaluation system used to determine human resource skills and how it implements the best industry-based organizational or project management [18,19]. Indicators to obtain management autonomy index are obtained by assessing the organization's maturity or readiness to construct and operate a solar power plant in Indonesia, and experts' opinions on the appropriate indicators are appropriate for calculating the management index .…”
Section: Background Introductionmentioning
confidence: 99%