2021
DOI: 10.1016/j.conbuildmat.2021.124047
|View full text |Cite
|
Sign up to set email alerts
|

Remediation of oil-based mud contaminated cement with talcum in shale gas well primary cementing: Mechanical properties, microstructure, and hydration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 37 publications
0
5
0
Order By: Relevance
“…Oil well cement, a specialty cement, is commonly used to fill the annular space between production pipelines and formations, displace drilling fluids, restrict fluid movement between formations, and isolate productive and non-productive areas [46,47]. In the environment of downhole high temperature and high pressure and gaseous phase oil-water mixture, by increasing the lipophilicity and oil phase permeability of oil well cement [48], the bonding performance between the cementing structure and the oil production pipeline and the stability of the oil production process can be improved [49], and the occurrence of annular air channeling can be prevented. Therefore, an increasing number of scholars have begun to study the modification of oil well cement's oleophilic properties, and these research results can provide some reference for the improvement of oil-absorption properties of ordinary cement-based materials.…”
Section: Influence Of Organic Matter Modification On Oil Absorption O...mentioning
confidence: 99%
See 1 more Smart Citation
“…Oil well cement, a specialty cement, is commonly used to fill the annular space between production pipelines and formations, displace drilling fluids, restrict fluid movement between formations, and isolate productive and non-productive areas [46,47]. In the environment of downhole high temperature and high pressure and gaseous phase oil-water mixture, by increasing the lipophilicity and oil phase permeability of oil well cement [48], the bonding performance between the cementing structure and the oil production pipeline and the stability of the oil production process can be improved [49], and the occurrence of annular air channeling can be prevented. Therefore, an increasing number of scholars have begun to study the modification of oil well cement's oleophilic properties, and these research results can provide some reference for the improvement of oil-absorption properties of ordinary cement-based materials.…”
Section: Influence Of Organic Matter Modification On Oil Absorption O...mentioning
confidence: 99%
“…The oil-absorption performance of modified cement is mainly affected by additives. If the number of micropores in the pore distribution of cement, the connectivity of pores, and the interface properties of cement pores are improved, the oil-absorption performance of cement can be improved [49].…”
Section: Modified Materialsmentioning
confidence: 99%
“…of CO 2 leakage. The sealing integrity of the cement-formation interface is susceptible to mud, [20,21] preflush, [22] spacer, [23] and residual filter cake. [24] During drilling operations, owing to the permeable formation action, only the liquid phase can penetrate the formation, leaving a layer of residue or solid particles in the borehole walls; this layer of residue or solid particles is called filter cake.…”
Section: Introductionmentioning
confidence: 99%
“…[ 1 ] Casing corrosion, [ 15 ] cement pore, [ 16 ] cement crack, [ 17 ] and cement–casing/cement–formation interface sealing failure [ 18,19 ] will be the possibility of CO 2 leakage. The sealing integrity of the cement–formation interface is susceptible to mud, [ 20,21 ] preflush, [ 22 ] spacer, [ 23 ] and residual filter cake. [ 24 ]…”
Section: Introductionmentioning
confidence: 99%
“…However, it is also important to use wash flow conditions that do not cause fractures in the formation, which can occur when the pumped fluid at the bottom of the borehole becomes excessively high due to a high delivery rate. Sufficient contact time between the wash and the annular space is necessary, as this allows the mud to be effectively removed [5][6][7][8][9]. Cleaning the borehole prior to cementing is essential for many reasons [10][11][12].…”
Section: Introductionmentioning
confidence: 99%