2022
DOI: 10.1007/s10064-022-02707-x
|View full text |Cite
|
Sign up to set email alerts
|

Repeated failure of a high cutting slope induced by excavation and rainfall: a case study in Fujian, Southeast China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 31 publications
0
3
0
Order By: Relevance
“…Improving supervision of land clearing, especially in vulnerable areas, so that there is no trimming of the foothills without considering the aspect of slope stability. Slope stability disturbances due to slope cutting are very common, both on slopes with loose sedimentary material or on slope bodies composed of layered sediments [34,35], especially with the effect of rising groundwater levels [36,37]. Good water management, particularly drainage channel design and building, so that concentrated water can be avoided in the steep slope area.…”
Section: Discussion Of Cimanggung Landslide Forensic and Future Disas...mentioning
confidence: 99%
“…Improving supervision of land clearing, especially in vulnerable areas, so that there is no trimming of the foothills without considering the aspect of slope stability. Slope stability disturbances due to slope cutting are very common, both on slopes with loose sedimentary material or on slope bodies composed of layered sediments [34,35], especially with the effect of rising groundwater levels [36,37]. Good water management, particularly drainage channel design and building, so that concentrated water can be avoided in the steep slope area.…”
Section: Discussion Of Cimanggung Landslide Forensic and Future Disas...mentioning
confidence: 99%
“…The spacing was 40 m, and the number of monitoring points was less than three at each level. The theoretical position of the potential failure surface was obtained based on previous 3D simulations and engineering survey specifications 35,36,38,39 www.nature.com/scientificreports/ surface. Thus, the drilling depth of the borehole on the first level of the slope platform should be 12 m, and that of the second and third levels should be 17 m. Deep monitoring points were not arranged on the fourth level of the slope platform (Fig.…”
Section: Optimization Of Slope Monitoring Based On 3d Slope Deformati...mentioning
confidence: 99%
“…These landslide disasters caused great loss of life and property. Many research investigations have discovered that failure on slopes is mainly caused by excavations [5][6][7][8][9], rainfall infiltration [10][11][12][13], or by human excavations accompanied by rainfall [14][15][16]. To avoid costly losses from sudden landslides, it is of great significance to conduct a comprehensive stability analysis of slopes under different scenarios.…”
Section: Introductionmentioning
confidence: 99%