“…On several of these sites, application resumed later in the year, when weather was drier, or 12 months after the allowable loading rate for N was reached. Other sites were considered permanently closed, either because the planned loading rate for experimental purposes had been achieved (e.g., Sycamore site and Pine site) or, in the case of the McCoy site, because higher than anticipated levels of 6oCo and 137CS were applied (Oakes, et aL, 1984).…”