2013 International Conference on Cloud and Service Computing 2013
DOI: 10.1109/csc.2013.32
|View full text |Cite
|
Sign up to set email alerts
|

Research of Software Size Estimation Method

Abstract: Software size estimation laid the data foundation for project planning. Among all the software estimation methods, function point method, COCOMO II, Pert, Delphi and Analogy are widely used. After conducting research on these methods and analyzing the advantages and disadvantages of them, this paper gives advice on how to choose estimation methods.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Then the project is divided into sub-projects or software component. This method can be used at the early phase of development because at that stage minimum derails are available which can be tackled in this model easily [20]. This method is useful when no detailed information is there.…”
Section: Top-down Methodsmentioning
confidence: 99%
“…Then the project is divided into sub-projects or software component. This method can be used at the early phase of development because at that stage minimum derails are available which can be tackled in this model easily [20]. This method is useful when no detailed information is there.…”
Section: Top-down Methodsmentioning
confidence: 99%
“…In software projects, modifications are considered agreed upon scope of the project. These modifications are due [5] Agile EVM [26] Burn-down charts [46] Burn-up charts [46] Function Points [48] Work-Breakdown Structure [49] Expert judgement [51] Performance analysis [52] Feature Transition Charts [53] Story Mapping [54] Stakeholder analysis [55] Benefit analysis [56] Requirement Matrix [56] Scope Change Control System [57] Functional Size Measurement (FSM) [58] Feature Survival Charts [59] Feature Growth Charts [60] SPSRI [61] Activity Based (top down) [62]- [63] Task based (bottom up) [62]- [63] PERT [64] Object point [65] Source line of code (SLOC) [65] Analogy technique [65] Price-to-win [62] VOLUME , 2020 to inevitable change and complexity of the project scope. According to [50] author "Half of the system requirements change till deployment".…”
Section: B Scope Definition Techniques/toolsmentioning
confidence: 99%
“…Barry Boehm [28] conducted a study based on literature analysis, conducting interviews and surveys with leading resource estimators and users, and concludes that the study on resource estimation has a direct impact with software engineering practices. Aihua Ren and Chen Yun [29] worked on most widely used size estimation models like analogy based Function Point, PERT, Delphi and other methods. Not all methods are suitable for all type of projects.…”
Section: Expert Judgement Approachmentioning
confidence: 99%