“…To reduce Joule losses at longer distances, voltages delivered by generators are increased with step-up power transformers, and electric energy is transported at large voltages [7,8]. Consequently, many ultra/extra AC/DC high-voltage transmission projects have been commissioned or are under construction in many countries: Canada (735 kV), Venezuela (800 kV), China (1100 kV), Japan (1100 kV), and India (1200 kV) [9][10][11][12][13][14][15][16][17][18]. For the power to be delivered to end-users, transmission grids, including towers, conductors, insulators, as well as substations, are essential [19][20][21][22].…”