Research on the Influence of Slurry Filling on the Stability of Floor Coal Pillars during Mining above the Room-and-Pillar Goaf: A Case Study

Abstract: Room-and-pillar mining is a commonly used mining method in previous practice in northwest China mining area. Due to priority selection of high-quality resources, coal mines in northwest China generally have to face upward mining above goaf. Thus, the stability of a floor coal pillar influenced by mining activities plays an essential role in upward mining above goaf. The results indicated that a floor coal pillar kept stable before coal excavation in the no. 6107 working face in the Yuanbaowan coal mine; howeve… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 18 publications
0
5
0
Order By: Relevance
“…The overall work done on the thin plate bending by the stress released by the slurry on the PKS is: slurry 4…”
Section: The Bed-separation Slurry Filling Mining 7221 Work Face Pks ...mentioning
confidence: 99%
“…The overall work done on the thin plate bending by the stress released by the slurry on the PKS is: slurry 4…”
Section: The Bed-separation Slurry Filling Mining 7221 Work Face Pks ...mentioning
confidence: 99%
“…However, the distinction of which coal pillar in the coal pillar cluster is the first to fail and lose stability is still based on the distinguishing index of single coal pillar instability, such as the ultimate strength [31][32][33] and plastic zone proportion ratio [34][35][36]. The variation law of internal stress and energy of each coal pillar in the whole process from local damage, crack extension, and the main crack penetration to the overall failure has not been considered under the action of mining stress disturbance in the adjacent coal seam.…”
Section: Introductionmentioning
confidence: 99%
“…The variation law of internal stress and energy of each coal pillar in the whole process from local damage, crack extension, and the main crack penetration to the overall failure has not been considered under the action of mining stress disturbance in the adjacent coal seam. More importantly, in numerical simulation, a large amount of literature has adopted the distribution range or ratio of plastic zones to distinguish the stability of coal pillars [34][35][36], i.e., the coal pillar is considered to be destabilized when the ratio of plastic deformation units to the total number of units in the coal pillar exceeds a critical value. However, the concrete value of this critical value is often obtained empirically, such as 69% in the literature [23,36], as well as other works taking the width of the elastic core of the coal pillar to be no less than two times the mining height as the critical condition for instability [29,37], or some works taking the connectivity of the plastic zone as the criterion of coal pillar instability [38].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…solid lling [5,7], paste lling [8,9], and slurry lling [10]. Bed-separation lling mining refers to introducing ller material into a cavity, primarily via the Isolated Overburden Grout Injection Technology.…”
Section: Introductionmentioning
confidence: 99%