2023
DOI: 10.1371/journal.pone.0285497
|View full text |Cite
|
Sign up to set email alerts
|

Research on the risk transmission mechanism of international construction projects based on complex network

Abstract: The risk transmission process between international construction projects largely contributes to the dilemma of risk management of international construction projects. Firstly, this paper adopts methods such as literature review and brainstorming to identify the risks in international construction projects from all aspects and all stages. Connections between risks is built by the Delphi method and further construct the international construction project risk network. Combined with “ucinet”, a network visualiza… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 43 publications
0
3
0
Order By: Relevance
“…For example, Li et al [86] found that lower safety awareness, violations of operation rules, insufficient security checks, and chaotic site management were the safety risks for SCSA. Interrelationships and interactions between risks are the root causes of safety risk accidents in metro construction, and the essence of risk transfer is the transfer path and process between risk nodes [87]. Based on 101 subway construction safety accident reports, this paper obtained two shorter key risk transfer paths in the subway construction safety network: insufficient safety education and training→lower safety awareness→violation of operation rules→safety accidents; insufficient safety checks or hidden trouble investigations→violation of operation rules→safety accidents, This is consistent with the risk transfer scenarios of real security incidents.…”
Section: Discussion and Management Implicationsmentioning
confidence: 99%
“…For example, Li et al [86] found that lower safety awareness, violations of operation rules, insufficient security checks, and chaotic site management were the safety risks for SCSA. Interrelationships and interactions between risks are the root causes of safety risk accidents in metro construction, and the essence of risk transfer is the transfer path and process between risk nodes [87]. Based on 101 subway construction safety accident reports, this paper obtained two shorter key risk transfer paths in the subway construction safety network: insufficient safety education and training→lower safety awareness→violation of operation rules→safety accidents; insufficient safety checks or hidden trouble investigations→violation of operation rules→safety accidents, This is consistent with the risk transfer scenarios of real security incidents.…”
Section: Discussion and Management Implicationsmentioning
confidence: 99%
“…Different stakeholders may prioritize risks differently based on their understanding and evaluation of these complex factors. [9,10,11,12]…”
Section: Subject Relativitymentioning
confidence: 99%
“…Various factors interact, resulting in frequent unsafe behavior. Analyzing these factors is crucial for risk management and prevention of accidents [1][2][3].…”
Section: Introductionmentioning
confidence: 99%