2020
DOI: 10.1088/1755-1315/455/1/012081
|View full text |Cite
|
Sign up to set email alerts
|

Research progress of soft soil foundation treatment technology

Abstract: With the extensive improvement of infrastructure in China in the past ten years, the soft soil foundation is becoming more and more complicated. Therefore, the improvement of soft soil foundation treatment has become a difficult problem that today’s engineering designers have to face. This paper systematically reviews the development of soft soil foundation treatment technology in our country, and emphatically introduces the development process of foundation treatment at home and abroad, especially in our coun… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…After nearly 10 years of development, port engineering has achieved fruitful results, especially the progress of soft foundation treatment technology. At present, the methods of soft foundation treatment commonly used in port engineering include the vacuum preloading method, pile-up preloading method, vacuum combined surcharge preloading method, dynamic compaction method, and vibroflotation replacement method [14]. e cost analysis at the design stage is mainly based on the Provisions on the Budget Preparation of Coastal Port Construction Projects and the supporting quotas (hereinafter referred to as the "current quotas") [15].…”
Section: Comparison Of Construction Schemes For Soft Foundation Treat...mentioning
confidence: 99%
“…After nearly 10 years of development, port engineering has achieved fruitful results, especially the progress of soft foundation treatment technology. At present, the methods of soft foundation treatment commonly used in port engineering include the vacuum preloading method, pile-up preloading method, vacuum combined surcharge preloading method, dynamic compaction method, and vibroflotation replacement method [14]. e cost analysis at the design stage is mainly based on the Provisions on the Budget Preparation of Coastal Port Construction Projects and the supporting quotas (hereinafter referred to as the "current quotas") [15].…”
Section: Comparison Of Construction Schemes For Soft Foundation Treat...mentioning
confidence: 99%
“…Expansion of clays, low shear strength, and high settlements are common problems in geotechnical engineering [1]. The shear strength of soils can be increased by applying cementing additives in the material to bring reinforcement to the soil [2]. On the other hand, compaction mitigates undesired settlements, reducing the void ratio and increasing stiffness [2].…”
Section: Introductionmentioning
confidence: 99%