2019
DOI: 10.1016/j.apenergy.2019.113324
|View full text |Cite
|
Sign up to set email alerts
|

Residential battery sizing model using net meter energy data clustering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 25 publications
(21 citation statements)
references
References 43 publications
0
21
0
Order By: Relevance
“…Studies [22]- [25] simulate the BESS operation in real-time using a rule-based control method that utilizes power thresholds. This BESS control method is well established that aims mainly to achieve a self-consumption maximization (SCM).…”
Section: A Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Studies [22]- [25] simulate the BESS operation in real-time using a rule-based control method that utilizes power thresholds. This BESS control method is well established that aims mainly to achieve a self-consumption maximization (SCM).…”
Section: A Literature Reviewmentioning
confidence: 99%
“…For BESS degradation, the annual reduction in savings due to degradation was modelled as a rate of 1% in [5], 5% in [22] and 0.4% in [23]. In [7], [27], EV battery degradation model was adopted.…”
Section: A Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Additionally, the declining in savings due to BESS degradation has been quantified using several methods, and the results were comparable. These methods include the use of fixed annual operation and maintenance (O&M) costs, savings degradation rate [9], and Li-ion degradation [27]. The presented results adopt the degradation factor (L) obtained from the degradation model [27], representing the yearly loss percentage in capacity/revenue in addition to a yearly O&M rate ( ) of the yearly capacity loss cost, this rate is introduced in agreement with the PV O&M by BEIS [28] to cover the O&M due to degradation and to compensate any error in the results obtained from the degradation model.…”
Section: B Case Studymentioning
confidence: 99%
“…The heat-pump loading as well as PV generation were considered for BESS sizing in [8]. In [9], a residential BESS sizing approach is proposed to maximize the net present value at the end of BESS lifetime in presence of PV for two tariff structures. Economic analysis for the installations of residential BESS equipped with PV can be found in [10].…”
Section: Introductionmentioning
confidence: 99%