2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D) 2016
DOI: 10.1109/tdc.2016.7519947
|View full text |Cite
|
Sign up to set email alerts
|

Resilient operation of multiple energy carrier microgrids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
49
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 24 publications
(49 citation statements)
references
References 0 publications
0
49
0
Order By: Relevance
“…Equations (6)-(9) express the nonlinear AC power flow equations. are the conductance/susceptance of lines; V it and / ikt are the voltage magnitude of buses and the voltage angle difference between buses i and k at time interval t. In (6) and (7), p ST t and q ST t are merely used for the bus at which the MG is connected to the upstream grid, i.e., the substation buses at the points of common coupling (PCC). For the remaining buses, these two variables are omitted from the left side of (6) and (7), respectively.…”
Section: Operating Constraints Of Power Networkmentioning
confidence: 99%
See 2 more Smart Citations
“…Equations (6)-(9) express the nonlinear AC power flow equations. are the conductance/susceptance of lines; V it and / ikt are the voltage magnitude of buses and the voltage angle difference between buses i and k at time interval t. In (6) and (7), p ST t and q ST t are merely used for the bus at which the MG is connected to the upstream grid, i.e., the substation buses at the points of common coupling (PCC). For the remaining buses, these two variables are omitted from the left side of (6) and (7), respectively.…”
Section: Operating Constraints Of Power Networkmentioning
confidence: 99%
“…Recently, some researchers have made strong efforts to propose energy management schemes for multi-carrier MGs [6][7][8][9][10]. In this regard, a hierarchical energy management system (EMS) for a multi-carrier MG was proposed in [6], where the thermal and NG management systems are integrated with the conventional EMS.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Another important distinction is considering over-generation of units after the attack, which is neglected in the literature [12], [13], [16]. According to the attacker, a direct attack is to destroy the lines that connect the load with the network.…”
Section: Problem Formulation a Defender-attacker-defender Formulmentioning
confidence: 99%
“…However, the nonconvexity introduced by the gas pressure equation and the discontinuity brought by committing generation units prevents dualizing the lower level problem and complicates the computation. The method in [16] ignores the discontinuity from committing generators and uses a linear approximation of the Weymouth equation, so as to build a linear lower level problem. In the proposed method, the Weymouth equation is first replaced by its piecewise linear approximation with mixed integer linear form [19], yielding a mixed integer linear programming (MILP) lower level, then the nested C&CG algorithm proposed in [20] is applied to solve the D-A-D model with discrete recourse decisions.…”
mentioning