2015
DOI: 10.15554/pcij60.1-03
|View full text |Cite
|
Sign up to set email alerts
|

Restoring a Collapsed Span Over the Skagit River

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
5
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
1
1
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…In the design phase, depending on the type of accelerated measures adopted for bridge construction, ABC might require designing an entire bridge or prefabricated bridge components (Banks, 2015;Ralls, 2007). The involvement of the contractor and specialty moving contractor in the design is important for successful execution of ABC (Harrington, 2014;Vanek, 2015). Additionally, the designer should be aware of the capability of the contractors involved in the project, and the material availability (Basu, 2005) for the suitable design of an entire bridge or modular bridge components.…”
Section: Literature Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…In the design phase, depending on the type of accelerated measures adopted for bridge construction, ABC might require designing an entire bridge or prefabricated bridge components (Banks, 2015;Ralls, 2007). The involvement of the contractor and specialty moving contractor in the design is important for successful execution of ABC (Harrington, 2014;Vanek, 2015). Additionally, the designer should be aware of the capability of the contractors involved in the project, and the material availability (Basu, 2005) for the suitable design of an entire bridge or modular bridge components.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Moreover, the design should incorporate tolerances for the placement of bridge components at the final location; the shop drawings for precast bridge components need to include a drawing of adjacent bridge components to avoid confusion during site installation (Banks, 2015). In addition, it is necessary to design the lifting diaphragms to facilitate site installation (Vanek, 2015). The success of an ABC project relies on proper coordination between the designer, fabricator, and specialty heavy lifting contractor to accelerate the production of critical bridge components, assure the timely procurement of long lead items, and plan for lifting operations (Vanek, 2015).…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations