2021
DOI: 10.1007/978-981-16-4103-9_17
|View full text |Cite
|
Sign up to set email alerts
|

Restructuring of Transmission Network to Cater Load Demand in Northern Parts of Rajasthan Using Renewable Energy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…and network loss for assessing flexibility level of the transmission network. In [10], the authors proposed a network restructuring approach for a transmission network by creating new grid substation (GSS) of 400/220 kV and additional transmission lines of 400 kV and 220 kV voltage levels which helped in meeting the increased load demand. In [11], the authors suggested an optimized restructuring of transmission system to meet increased load demand due to installation of refinery and petrochemical complex.…”
mentioning
confidence: 99%
“…and network loss for assessing flexibility level of the transmission network. In [10], the authors proposed a network restructuring approach for a transmission network by creating new grid substation (GSS) of 400/220 kV and additional transmission lines of 400 kV and 220 kV voltage levels which helped in meeting the increased load demand. In [11], the authors suggested an optimized restructuring of transmission system to meet increased load demand due to installation of refinery and petrochemical complex.…”
mentioning
confidence: 99%