Abstract:The Commission of the Ministry of Power and Electrification of the USSR (Min~nergo) inspected the temporary diversion tunnel of the Kurpsa hydroelectric station, made with a lightweight lining, after its operation for 2 years and 8 months.The tunnel was originally designed with the following parameters:tunnel length, 634.1 m; inside cross section, 76 m=; type of lining, monolithic concrete with a thickness from 40 to 70 cm; roughness coefficient, 0.071; discharge capacity, ii00 m3/sec; concrete of the invert, … Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.