1981
DOI: 10.1007/bf01427593
|View full text |Cite
|
Sign up to set email alerts
|

Results of inspecting the temporary diversion tunnel of the Kurpsa hydroelectric station after completion of its operation

Abstract: The Commission of the Ministry of Power and Electrification of the USSR (Min~nergo) inspected the temporary diversion tunnel of the Kurpsa hydroelectric station, made with a lightweight lining, after its operation for 2 years and 8 months.The tunnel was originally designed with the following parameters:tunnel length, 634.1 m; inside cross section, 76 m=; type of lining, monolithic concrete with a thickness from 40 to 70 cm; roughness coefficient, 0.071; discharge capacity, ii00 m3/sec; concrete of the invert, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

1995
1995
1995
1995

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance