“… References | Year | Components of test system used | Objective functions | Methodology | Remarks |
54 | 2024 | WT, PV, battery, MT, diesel generator, FC | Operation cost | Intelligent golden jackal optimization | Integration of electric vehicle is not considered |
55 | 2023 | PV, battery, MT, thermal generator, CHP | Operation cost, emission | Epsilon constraint algorithm | Integration of WT and FC not considered |
56 | 2024 | WT, PV, battery, MT, diesel generator, FC | Operation cost, emission | Manta ray foraging optimization | Analysis of environmental pollution is ignored. Multi-objective optimization not implemented |
57 | 2023 | CES, EES, CAES, EHP, AC, heat pump | Operation cost, emission | Blue whale optimization algorithm | Integration of WT, PV, and MT not considered. Different charging modes of EV not analyzed |
58 | 2023 | PV, WT, battery | MG and EV cost | Enhanced variant multi-objective particle swarm optimization algorithm | Analysis of environmental pollution is ignored |
59 | 2023 | CHP, gas boiler, WT, PV, HS, BS | Operating cost of multi-microgrid, profit of the distribution company | Mixed-integer linear programming, ε-constraint approach, mixed-integer nonlinear programming | Analysis of environmental pollution is ignored |
60 | 2023 | WT, PV, battery, MT, diesel generator, FC and grid | ... |
…”