2016 International Conference on Smart City and Systems Engineering (ICSCSE) 2016
DOI: 10.1109/icscse.2016.0084
|View full text |Cite|
|
Sign up to set email alerts
|

Retracted: Study on Construction Time of Secondary Lining for Large Section Shallow Buried Tunnel in Soft Rock

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The "space-time effect" of the excavation face can be divided into two stages: the "spatial effect" and "time effect" [21,22] (as shown in Figure 11); the "spatial effect" mainly acts on the S 1 section, whereas the "time effect" corresponds to the rheology of the surrounding rock, which is mainly reflected in the S 3 section. However, the initial support of the tunnel is generally completed in the BC section and the CD section is mainly the equilibrium and stable stage of the interaction between the surrounding rock and the supporting structure.…”
Section: Theoretical Analysismentioning
confidence: 99%
“…The "space-time effect" of the excavation face can be divided into two stages: the "spatial effect" and "time effect" [21,22] (as shown in Figure 11); the "spatial effect" mainly acts on the S 1 section, whereas the "time effect" corresponds to the rheology of the surrounding rock, which is mainly reflected in the S 3 section. However, the initial support of the tunnel is generally completed in the BC section and the CD section is mainly the equilibrium and stable stage of the interaction between the surrounding rock and the supporting structure.…”
Section: Theoretical Analysismentioning
confidence: 99%
“…Feng et al [29] found that the reasonable secondary lining supporting time of soft rock tunnels is 24~25 days after excavation. Zhang et al [30] analyzed a substantial amount of shallow buried tunnel displacement monitoring data in soft rock. Construction of the secondary lining is permissible when the tunnel vault's settlement rate is below 0.49 mm/d and the side wall's horizontal absolute convergence rate is below 0.15 mm/d.…”
Section: Introductionmentioning
confidence: 99%