2009 IEEE International Conference on Industrial Technology 2009
DOI: 10.1109/icit.2009.4939562
|View full text |Cite
|
Sign up to set email alerts
|

Reuse of HiL simulation models in the operation phase of production plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 8 publications
0
7
0
Order By: Relevance
“…In comparison with VC, HVC does not require a purely virtual model, but combines it with available devices which do not need to be modeled or simulated. In comparison with HC (as described in [19]), HVC does not assume a successive transition A particular form of V&V is essentially the VC approach, which enables to shorten the time needed for programming and to resolve various software errors-and in conjunction with a suitable simulation environment, also construction defects. The connection of VC and DT offers an effective perspective on the product lifecycle.…”
Section: Hybrid Virtual Commissioningmentioning
confidence: 99%
“…In comparison with VC, HVC does not require a purely virtual model, but combines it with available devices which do not need to be modeled or simulated. In comparison with HC (as described in [19]), HVC does not assume a successive transition A particular form of V&V is essentially the VC approach, which enables to shorten the time needed for programming and to resolve various software errors-and in conjunction with a suitable simulation environment, also construction defects. The connection of VC and DT offers an effective perspective on the product lifecycle.…”
Section: Hybrid Virtual Commissioningmentioning
confidence: 99%
“…Another concept where a real control system is connected to a simulation model and a real production system at the same time is known as synchronous simulation [11]. Unlike the hybrid commissioning, synchronous simulation is implemented after the real commissioning, i.e.…”
Section: Synchronous Simulationmentioning
confidence: 99%
“…Deviations found after the comparison of signals are then corrected. In [11] a few approaches are presented to implement synchronous simulation along with the requirements. Comparisons made using this approach are based on the production system description (usually expressed in terms of different drawings and natural language).…”
Section: Synchronous Simulationmentioning
confidence: 99%
See 2 more Smart Citations