Review of Lean Design Management: Processes, Methods and Technologies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
32
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
4
3
1

Relationship

2
6

Authors

Journals

citations
Cited by 22 publications
(34 citation statements)
references
References 0 publications
1
32
0
1
Order By: Relevance
“…LDM offers several methods and tools to facilitate design management. Uusitalo et al (2017) reviewed and categorized the current LDM concepts that are generally considered to support lean thinking into 1) social processes, 2) methods and 3) technologies. In Seppänen et al's (2010) discussion of production control systems for construction, the authors distinguished between social and technical systems.…”
Section: Lean Design Managementmentioning
confidence: 99%
See 1 more Smart Citation
“…LDM offers several methods and tools to facilitate design management. Uusitalo et al (2017) reviewed and categorized the current LDM concepts that are generally considered to support lean thinking into 1) social processes, 2) methods and 3) technologies. In Seppänen et al's (2010) discussion of production control systems for construction, the authors distinguished between social and technical systems.…”
Section: Lean Design Managementmentioning
confidence: 99%
“…The more transparent and fast the information flow, the more efficiently the team can solve design management problems through shared intentionality (Bar-Yam, 2004;Sloman and Fernbach, 2017). Table 1 includes the categorization of the LDM concepts, identified by Uusitalo et al (2017), into social and technical domains based on their key mechanisms. Most of the concepts are primarily technical in nature, with a focus on structuring the information and improving its flow between parties.…”
Section: Lean Design Managementmentioning
confidence: 99%
“…[ 16,35,40,41,43,46,48,[52][53][54][55][56][57][58] PC 6 The coordination of project information between the different stakeholders is performed through a single platform, which allows systematic updates and continuous communication between stakeholders. [14,24,35,36,40,54,56,58,59] During the design phase, there are many iterations associated with both the creative process of design and the existence of problems of a different nature, such as incompatibilities between specialties, regulatory constraints, economic constraints, and ill-defined requirements, among others [34]. Therefore, these creative or problem iterations will generate instances of decision making and problem solving (category 3), which can be addressed individually and centralized, collaboratively and decentralized [60], or intuitively with defined and standardized action protocols [23,61].…”
Section: Of 19mentioning
confidence: 99%
“…The decision-making mechanism is a meeting with all stakeholders involved, where a specific technique is used, for example, choosing by advantage (CBA) or others. [14,22,23,35,40,42,43,58,[62][63][64] DM 8…”
Section: Id Definition Sourcesmentioning
confidence: 99%
“…It is difficult to say with certainty, based on available information, but the method that Suffolk Construction, Boston, applies to handle design processes (Uusitalo, Olivieri, Seppänen, Pikas and Peltokorpi, 2017) resembles process-oriented milestone planning. The authors write that Suffolk, unlike other cases they have studied, apply a milestonedriven pull plan to manage Level of Detail (LoD) (Leite, Akcamete, Akinci, Atasoy & Kiziltas, 2011) in BiM based on milestone requirements.…”
Section: Introductionmentioning
confidence: 99%