2021
DOI: 10.3390/a14110319
|View full text |Cite
|
Sign up to set email alerts
|

Risk Assessment Algorithm for Power Transformer Fleets Based on Condition and Strategic Importance

Abstract: In every electric power system, power transformers (PT) play a critical role. Under ideal circumstances, PT should receive the utmost care to maintain the highest operative condition during their lifetime. Through the years, different approaches have been developed to assess the condition and the inherent risk during the operation of PT. However, most proposed methodologies tend to analyze PT as individuals and not as a fleet. A fleet assessment helps the asset manager make sound decisions regarding the mainte… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
10
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 14 publications
(10 citation statements)
references
References 31 publications
0
10
0
Order By: Relevance
“…For this purpose, steps one to four in Figure 4 are proposed to obtain an initial risk matrix, and a cluster of aged units. However, because of space limitation, those four steps are considered out from the scope of this paper, but it is recommended to apply a methodology like the reported in [8] or [37], for this former classification in clusters.…”
Section: New Multi-period Replacement Optimization Methodologymentioning
confidence: 99%
See 4 more Smart Citations
“…For this purpose, steps one to four in Figure 4 are proposed to obtain an initial risk matrix, and a cluster of aged units. However, because of space limitation, those four steps are considered out from the scope of this paper, but it is recommended to apply a methodology like the reported in [8] or [37], for this former classification in clusters.…”
Section: New Multi-period Replacement Optimization Methodologymentioning
confidence: 99%
“…Power transformer health indices are computed for each power transformer in the fleet. For this purpose, a methodology like the one described in [37] can be used.…”
Section: New Multi-period Replacement Optimization Methodologymentioning
confidence: 99%
See 3 more Smart Citations