Risk Assessment Analysis to Find Optimum ROCOF Protection Settings

Abstract: The rate of change of frequency during transmission system disturbances in UK will increase in incoming years. This is due the decreasing system inertia and increasing maximum generation loss in the system. Therefore, ROCOF protection will require higher setting to prevent unwanted operation while still ensuring correct detection of LOM condition. This paper proposes risk assessment analysis as a technique to find optimum setting which aims to minimise the risk of protection malfunction. The analysis use predi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 4 publications
0
4
0
1
Order By: Relevance
“…Based on the related research [8] , the upper limit of RoCoF is set to 1.5 Hz/s in this paper. By limiting RoCoF and substituting its limit value into equation (4), the system inertia demand determined by the maximum frequency change rate is obtained:…”
Section: ) the Maximum Rocof Determines The Inertia Demandmentioning
confidence: 99%
“…Based on the related research [8] , the upper limit of RoCoF is set to 1.5 Hz/s in this paper. By limiting RoCoF and substituting its limit value into equation (4), the system inertia demand determined by the maximum frequency change rate is obtained:…”
Section: ) the Maximum Rocof Determines The Inertia Demandmentioning
confidence: 99%
“…Relai ini biasa digunakan pada pembangkit tersebar untuk mendeteksi terlepasnya grid dari jaringan distribusi. Sehingga merupakan salah satu jenis relai anti islanding [7], [8,9], [10], [11]. Relai ROCOF juga dapat digunakan untuk mendeteksi ketidakseimbangan pembangkitan dan beban, sehingga memiliki potensi untuk digunakan sebagai relai pelepasan beban akibat kekurangan pembangkitan secara tibatiba.…”
Section: Pendahuluanunclassified
“…If the RoCoF following a frequency deviation is too high, it increases the risk of cascading frequency events, as a result of the tripping of RoCoF relays; these relays, such as the loss of mains (LoM) protection relays, are designed to open relevant circuits when the system RoCoF reaches a given limit [6]. This raises concerns regarding the behaviour of the power system in the first few seconds following a mismatch of power supply and demand.…”
Section: = % 2 × )*)mentioning
confidence: 99%