2018
DOI: 10.12911/22998993/81781
|View full text |Cite
|
Sign up to set email alerts
|

Risk Assessment Method for Identification of Environmental Aspects and Impacts at Ore Processing Industry in Indonesia

Abstract: Ore processing industry in Indonesia applies the international standard of environmental management system based on ISO 14001:2015. The implementation of clause 6.1.2 requires every organization to identify the environmental aspects of its operations, as an initial step in environmental management. The objective of this research is to develop a structured approach in identifying the environmental aspects and impacts so that an evaluation on the risks, opportunities as well as severity of possible environmental… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
2

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(7 citation statements)
references
References 5 publications
0
5
0
2
Order By: Relevance
“…Environmental aspects can be attributed to the activity that interferes with the natural environmental condition called the impact that is the resultant of an aspect (Susanto & Mulyono, 2018). There is a significant amount of water, energy and other resources are consumed by the studied industries.…”
Section: Results and Discussion Risk Rating For Environmental Aspectsmentioning
confidence: 99%
“…Environmental aspects can be attributed to the activity that interferes with the natural environmental condition called the impact that is the resultant of an aspect (Susanto & Mulyono, 2018). There is a significant amount of water, energy and other resources are consumed by the studied industries.…”
Section: Results and Discussion Risk Rating For Environmental Aspectsmentioning
confidence: 99%
“…Data for each hazardous event were collected based on each incident that occurred throughout the year. The risk score obtained is based on the results of its likelihood and severity [13,16]. Table 5 provides further details: The results of the high-risk assessment category show two critical control points (CCPs): In the dam and pipe reticulation.…”
Section: Discussionmentioning
confidence: 99%
“…The purpose of this study was to build a structured drinking-water risk management plan (RMP) for the development of effective drinking water supply systems, especially in areas hosting the ore processing industry. Ore mining occurs in the Mimika Regency region, Papua Province, Indonesia [13], with a working population of more than 2000 people as shown in Figure 1, which is categorized as an average number of drinking water consumers [6]. We used a semi-quantitative matrix approach, a five-cell risk assessment format that applies technical information from the regulations [4,5,14,15], different color background of categories shown of severity of consequences, as illustrated in Table 1.…”
Section: Methodsmentioning
confidence: 99%
“…Opportunity implementation exists in some literature and article related to project management [5]- [9], enterprise management systems [10], and good example implementation in TAMCO [11]. On the contrary, many implementations only see one side of handling risk in quality, occupational health, and environmental management systems [12] [13]. The literature to exploit the opportunity in EMS is limited, and this article tries to discover the main reason why the opportunity is not widely used in EMS from the expert point of view.…”
Section: Introductionmentioning
confidence: 99%
“…Unfortunately, the use of opportunity is still not widespread. Much recent research focuses on the negative impact of uncertainty, for example, risk management in project management implementation [16] and the ore processing industry [13].…”
Section: Introductionmentioning
confidence: 99%