2022
DOI: 10.1155/2022/9233833
|View full text |Cite
|
Sign up to set email alerts
|

Risk Assessment of EPB Shield Construction Based on the Nonlinear FAHP Method

Abstract: There are many risk factors in EPB shield construction. The traditional fuzzy analytic hierarchy process (FAHP) method usually uses a linear analysis method to determine the risk level, but there are often some risk factors with prominent influence, which will reduce the accuracy of the evaluation results. In this paper, a new risk assessment model of Earth pressure balance (EPB) shield construction based on a nonlinear FAHP method is established by introducing nonlinear factors into the comprehensive calculat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 27 publications
0
1
0
Order By: Relevance
“…In order to meet the great demand for urbanization for land resources, and to reduce the environmental effects caused by construction, underground space engineering has been greatly developed [1][2][3][4]. The shield method has been widely developed and applied as a safe, fast, and environment-friendly tunnel construction technology to solve the travel problems of urban residents [5][6][7].…”
Section: Introductionmentioning
confidence: 99%
“…In order to meet the great demand for urbanization for land resources, and to reduce the environmental effects caused by construction, underground space engineering has been greatly developed [1][2][3][4]. The shield method has been widely developed and applied as a safe, fast, and environment-friendly tunnel construction technology to solve the travel problems of urban residents [5][6][7].…”
Section: Introductionmentioning
confidence: 99%