2021
DOI: 10.1109/tpwrd.2020.2980437
|View full text |Cite
|
Sign up to set email alerts
|

Risk-Based Underground Cable Circuit Ratings for Flexible Wind Power Integration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 17 publications
0
6
0
Order By: Relevance
“…This methdology introduces a learningbased probabilistic estimation of the risk linked to a violation of the maximum allowed temperature constraint, and estimates the curtailment strategy to be performed. Liu et al have also developed a probabilistic framework to determine the hours-ahead power production planning of a wind farm based on on ARMA model of the wind power forecast, still in order to define the curtailment strategy [13]. Kazmi et al [14] formulated the optimal sizing of a wind farm as a two-stage MILP problem, where the inner stage covers the optimal energy management of the farm.…”
Section: B Optimal Energy Management Of Wind Farms With Overplantingmentioning
confidence: 99%
“…This methdology introduces a learningbased probabilistic estimation of the risk linked to a violation of the maximum allowed temperature constraint, and estimates the curtailment strategy to be performed. Liu et al have also developed a probabilistic framework to determine the hours-ahead power production planning of a wind farm based on on ARMA model of the wind power forecast, still in order to define the curtailment strategy [13]. Kazmi et al [14] formulated the optimal sizing of a wind farm as a two-stage MILP problem, where the inner stage covers the optimal energy management of the farm.…”
Section: B Optimal Energy Management Of Wind Farms With Overplantingmentioning
confidence: 99%
“…The cable temperature estimation is a widely addressed research area with applications in dynamic line rating [21], [22], [23] and lifetime estimation [24]. In addition to the thermal stress, there are models focused on the analysis of the joint influence of electrical and thermal stresses [17].…”
Section: A Related Workmentioning
confidence: 99%
“…Due to the mismatch between the increasing rate of electricity demand and that of the new cable lines, the transmission capacity requirement of existing cable lines is intensifying gradually [1][2][3]. To alleviate this situation, it is important to fully develop the ampacity of existing cable lines.…”
Section: Introductionmentioning
confidence: 99%