2020
DOI: 10.1016/j.ijhydene.2020.04.131
|View full text |Cite
|
Sign up to set email alerts
|

Risk-constrained probabilistic optimal scheduling of FCPP-CHP based energy hub considering demand-side resources

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
37
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 33 publications
(37 citation statements)
references
References 36 publications
0
37
0
Order By: Relevance
“…This section is devoted to the riskrelated constraints as seen in relation ( 59) to (61). 29 Where VAR presents the value at risk, α is the confidential level, γ s is an auxiliary variable for risk assessment and PR s is the probability of the s th scenario. Equation (59) demonstrates the risk cost of the SEH.…”
Section: Risk Constraintsmentioning
confidence: 99%
See 4 more Smart Citations
“…This section is devoted to the riskrelated constraints as seen in relation ( 59) to (61). 29 Where VAR presents the value at risk, α is the confidential level, γ s is an auxiliary variable for risk assessment and PR s is the probability of the s th scenario. Equation (59) demonstrates the risk cost of the SEH.…”
Section: Risk Constraintsmentioning
confidence: 99%
“…This study aims to minimize the total operation and emission costs of the SEH as well as its risk cost, as presented in Equation (62). 29 The first target in the scheduling cost is the minimization of the operation and emission cost. The second target is the risk control.…”
Section: Objective Functionmentioning
confidence: 99%
See 3 more Smart Citations