2020
DOI: 10.13106/jafeb.2020.vol7.no11.347
|View full text |Cite
|
Sign up to set email alerts
|

Risk Factors Affecting Equipment Management in Construction Firms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Although this approach improved efficiency and reduced measurement errors, it incurred significant costs. The detection equipment enhanced production efficiency, minimized operational errors, ensured detection repeatability, and generated extensive monitoring data [ 17 , 18 , 19 , 20 ]. However, these measures still failed to prevent levelness deviations during the climbing process, addressing the complexity of repairing such deviations and mitigating subjective errors in worker operations.…”
Section: Introductionmentioning
confidence: 99%
“…Although this approach improved efficiency and reduced measurement errors, it incurred significant costs. The detection equipment enhanced production efficiency, minimized operational errors, ensured detection repeatability, and generated extensive monitoring data [ 17 , 18 , 19 , 20 ]. However, these measures still failed to prevent levelness deviations during the climbing process, addressing the complexity of repairing such deviations and mitigating subjective errors in worker operations.…”
Section: Introductionmentioning
confidence: 99%
“…Several studies have been conducted to examine construction safety risks and monitor equipment and facilities at construction sites [7][8][9][10][11]. Peng et al [12] concluded that in their entire life cycle, buildings are prone to risks during the construction phase, particularly the concrete pouring phase of the reinforced concrete structures.…”
Section: Introductionmentioning
confidence: 99%