Risk identification for PPP waste-to-energy incineration projects in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

2
85
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 117 publications
(87 citation statements)
references
References 28 publications
2
85
0
Order By: Relevance
“…Various types of information on the 10 projects have been collected. Data collected in different means were thoroughly analyzed by content analysis, which contains a systematic analytic process of three steps, (1) identification of government guarantees provided in each project, (2) identification of their corresponding project performances, and (3) analysis of the relationship between government guarantees and their corresponding project performance (Song et al 2013). The coding system for government guarantees, as shown in Table 3, follows the coding order in Table 1.…”
Section: Government Guarantees and Corresponding Project Performance mentioning
confidence: 99%
“…Various types of information on the 10 projects have been collected. Data collected in different means were thoroughly analyzed by content analysis, which contains a systematic analytic process of three steps, (1) identification of government guarantees provided in each project, (2) identification of their corresponding project performances, and (3) analysis of the relationship between government guarantees and their corresponding project performance (Song et al 2013). The coding system for government guarantees, as shown in Table 3, follows the coding order in Table 1.…”
Section: Government Guarantees and Corresponding Project Performance mentioning
confidence: 99%
“…Unlike other types of PPP projects, a PPP WTE incineration project has two main sources of income: MSW treatment subsidy and power generation income. In practice, the income from MSW treatment generally depends on the per-unit subsidy and the adjusted quantity of the treated MSW [4] . Subsidy for each PPP WTE incineration projects should be adjust every 3~5 years, and it differs a lot by social, economic and environment factors.…”
Section: Variable Definition and Data Analysismentioning
confidence: 99%
“…Almost all of WTE power plants have been developed in China through public private partnership (PPP) arrangement, which is regarded as an effective means to attract funds from the private sector to provide public works and services and to improve efficiency (example, shorter construction time, lower construction cost, and lower operation and maintenance cost) in the delivery of such works and services [4]. PPP WTE incineration plants which cover build, operate and transfer arrangements for merely 20~30 years.…”
Section: Variable Definition and Data Analysismentioning
confidence: 99%