2017
DOI: 10.1115/1.861394
|View full text |Cite
|
Sign up to set email alerts
|

Risk Importance Measures in the Design and Operation of Nuclear Power Plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…Components with a RAW value equal to or greater than 2, CCF RAW value equal to or greater than 20, or FV equal to or greater than 0.005 were considered to be of significant risk [5].…”
Section: Methodsmentioning
confidence: 99%
“…Components with a RAW value equal to or greater than 2, CCF RAW value equal to or greater than 20, or FV equal to or greater than 0.005 were considered to be of significant risk [5].…”
Section: Methodsmentioning
confidence: 99%
“…As a measure of the importance of degradation (e.g., due to aging or environmental conditions), a reliability importance can be considered, which is defi ned as (e.g., Ref. [13] and its references):…”
Section: Reducing Facility's Risk Through Consideration Of Risk-impor...mentioning
confidence: 99%
“…It is easy to show, in Ref. [13], that the RAW and RRW for a particular failure event X are related to each other, with the probability of the considered failure event, P(X), as a parameter. Particularly:…”
Section: Introductionmentioning
confidence: 99%
“…This cycle is relatively convoluted, is dependent upon interpretation, and now and again requires extra assessments. Accessibility of measures that can be straightforwardly associated with a segment of a safety system, "component level" significance measures, can work on the utilization of these actions in numerous applications [13].…”
Section: Author Detailsmentioning
confidence: 99%