2018
DOI: 10.1051/matecconf/201825106012
|View full text |Cite
|
Sign up to set email alerts
|

Risk management to ensure the exploitation reliability of high-rise buildings

Abstract: The paper presents the results of a study of design risks affecting the exploitation reliability of high-rise buildings. The aim of the study was to study and optimize risk management strategies. The relevance of the work is justified by the statistics of recorded violations in the design of high-rise buildings, which affects their quality in the process of exploitation, leading to disastrous consequences. Existing methods of risk assessment take into account natural and man-made hazards. The consequences of r… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 4 publications
(2 reference statements)
0
2
0
Order By: Relevance
“…However, multicriteria optimization is very complex and rarely used in practice. A scientific approach based on quantitative decision-making methods makes it possible to improve the quality of decisions made [16,17]. Therefore, the purpose of this study is to develop a decision-making model for choosing the optimal energy-saving technology based on the hierarchy analysis method.…”
Section: Methodsmentioning
confidence: 99%
“…However, multicriteria optimization is very complex and rarely used in practice. A scientific approach based on quantitative decision-making methods makes it possible to improve the quality of decisions made [16,17]. Therefore, the purpose of this study is to develop a decision-making model for choosing the optimal energy-saving technology based on the hierarchy analysis method.…”
Section: Methodsmentioning
confidence: 99%
“…The final conceptual model of decision making (Table 1) on the choice of additional protective measure is based on a point estimate of the level of effectiveness of its implementation [22][23][24] and takes into account the degree of reduction of the negative impact of the proposed protective measure, the degree of its influence on the increase in material costs during implementation. The following scale of assessment of the degree of influence of an additional measure on the economic efficiency of works is proposed in the work:…”
Section: Methodsmentioning
confidence: 99%
“…It is assumed that such models should be developed by updating information throughout the life cycle of buildings. At the same time, at present, the most widely used information models are used at the design stage [6], to visualize data about the object, as well as to control project risks [7][8][9][10]. To a lesser extent, they are used at the construction stage and are practically not used for data management during the exploitation phase of the buildings [11][12][13].…”
Section: Introductionmentioning
confidence: 99%